«

»

Jun 15

Dreamworld Update June 2014

Welcome to our Dreamworld update for June. A fair bit of activity is happening around the park as well as next door at Whitewater World.

Wipeout

 

Wipeout is still undergoing a major refurbishmentWipeout Op Booth

The whole ride and surrounds have been given a new coat of paint
Entrance Changeroom Theming Queue The queue line is being reconfigured as part of the rides overhaul.

Queue Reef Diver Reef diver has been removed from its place in the park and is now out the back in storage.

MeshOne of the first things seen at Whitewater World is a fenced off section with mesh and piping for the new slide.

WWW Slide The new slide has a considerable foot print and will be interesting to see how it fits in with the existing slides in the area.

WWW Slide Most of the space between Pipeline Plunge and The RIP will be taken up by the new slide.WWW Slide

The slide will most likely start from either The RIP or BRO tower.WWW Slide WWW Slide WWW Slide WWW Slide

 

That is all for the June update. If you are after a more in-depth update with what’s happening with the former Reef Diver site we suggest checking out Parkz.com.au

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>